Church Refurbishment Project

In 1999, Sacred Heart Parish created a Master Plan for the parish. The plan included painting the interior of the church - something that hadn't been done in about twenty-five years. This plan inspired a project which blossomed into a major refurbishing of the church. Plans were made to install new floor coverings and to refinish the pews. Lighting to highlight the unique architectural features of the church were included. There had never been a restroom in the church, so one was incorporated into the plan. The stations of the cross and statues were greatly in need of repair. New sanctuary furniture to complement the interior decoration of the church was designed. A fundraising campaign was launched to raise the $200,000 needed to complete this major undertaking. Volunteer labor was used in the areas of painting preparation, restroom construction, reupholstering the kneelers, etc. The project got underway in the fall of 2002 and is now complete.

While the church was being refurbished, the parishioners worshipped in the parish hall. The parish moved back into the church to celebrate the great feast of Easter. The rededication of The Church of the Sacred Heart of Jesus took place on June 29 of 2003.


Contributions to the project are still needed and can be sent to:

Sacred Heart Refurbishment Campaign
3910 SE 11th Avenue
Portland, Oregon, 97202

Church Refurbishment and Rededication Slide Show

click on a thumbnail image for a larger view
or
click on the first picture and proceed through the slide show


Reroofing steeple and painting the cross


Church interior
before
the project began


Removing kneelers
for recovering


Cutting material
in preparation
for recovering kneelers


Stapling material
on kneelers


Sanding woodwork in preparation for painting


Volunteers sanding and prepping for painting


Preparing for painting


Sanding


Sanding window frame


Volunteers removing old carpeting


Scaffolding put up in preparation for painting


Scaffold up
and ready for painting


Painting Church interior


Painting the north nave


Repainting
The Stations of the Cross


Removing
stained glass windows


Removing the organ console from the balcony


Church exterior


Refurbished interior of Church

Main altar

Main altar statues

Sacred Heart of Jesus
Main altar

St. Benedict
Main altar

St. Patrick
Main altar

Our Blessed Mother

St. Joseph

Example of a refurbished
Station of the Cross

View of choir loft and
newly refinished organ pipes

Procession at
Rededication Mass

Bishop Kenneth Steiner

Bishop and Clergy

A reception was held in the parish hall following the
Rededication Mass

Sacred Heart family and friends celebrating the newly refurbished Church

A good time was had by all!

Back Home